The Standup I Almost Missed
The build finished at 9:02 a.m. on a Tuesday. I know the exact time because I was staring at the terminal like it owed me something, and when the green text finally rolled through I actually said "yes" out loud, alone, in the back bedroom I use as an office. There was nobody to hear it except the ceiling fan, which did not react.
I had been nursing that build since the previous afternoon. One of those situations where a dependency update that was supposed to take forty minutes somehow ate the rest of Monday and then a chunk of Tuesday morning, and somewhere around 8:45 I had stopped believing it would ever finish. I had made a second cup of coffee I didn't need. I had opened three browser tabs and closed them without reading anything. I had checked the terminal, walked to the kitchen, walked back, checked the terminal again — the remote engineer's version of watching a pot.
And then it ran. And I sat there for a solid sixty seconds just feeling good about it. Which is exactly how I almost missed the 9:05 standup.
Read smarter, capture the best ideas, and turn lessons from business books into practical actions that can strengthen and grow your business.
How One Stuck Build Ate Seventeen Hours of My Life
The dependency in question was something I had flagged two sprints ago. Not flagged loudly — flagged in the way you flag things when you're pretty sure it'll be fine and you don't want to be the person who turned a routine update into a ticket. So I left a comment in the PR, we merged, and I mentally filed it under "probably fine."
It was not fine. It was fine for three weeks, and then it wasn't, and by the time it surfaced as an actual problem it had mutated into something that required me to trace back through a chain of version locks that apparently nobody had looked at since 2023. I am not going to pretend I understood all of it. I Googled more than I'd like to admit. I have been writing software professionally for long enough that I should not have to Google some of the things I Googled on Monday, and yet.
This is the part of the day job that the side hustle stuff never touches. A DoorDash shift has a clear end — you drop the food, the app closes the order, you go home. A stuck build has no such mercy. It just sits there, running or not running, and you sit with it.
9:02 Green, 9:05 Standup, Zero Seconds to Celebrate
When the terminal went green I did the sixty seconds of quiet celebration I mentioned. Then I did something dumber: I started reading the output. Not because I needed to — it had passed, the thing had worked — but because I wanted to understand why it had worked, which is a perfectly reasonable engineering instinct that has absolutely no place in the ninety seconds before a standup.
My calendar notification fired at 9:04. I had it set to one minute before, which I thought was fine until it was not fine. I scrambled for the meeting link, knocked my coffee — mercifully almost empty — and joined the call with my camera off and my audio clearly coming from a man who had just been running.
"Jeff, you good? You sound like you sprinted here."
That was Marcus, our tech lead, who has the specific talent of noticing things and saying them plainly. I told him the build had just finished. He said "nice" in the tone of someone who has heard that before and moved on to the next person's update. The standup lasted eleven minutes. My update took forty-five seconds. The seventeen hours of context I was carrying did not make it into the call.
This is something I've thought about before — the relationship between builds and standups is its own specific comedy. The build doesn't know about the meeting. The meeting doesn't know about the build. You are the only one holding both things at once, and you will always be slightly unprepared for whichever one demands your attention first.
What Seventeen Hours of Debugging Actually Costs at the Margins
The day job paid me for all of it, which is the point. That's what a salary is — it covers the Mondays where you stare at a terminal for six hours and produce nothing visible, the same as it covers the days you ship something clean before lunch. I am not complaining about that deal. I took the deal. The deal is why the kids have a house.
What it cost that wasn't on the clock was everything else. I had a DoorDash window Monday evening that I talked myself out of because I was too deep in the dependency trace to feel like switching gears. I had told myself I'd do a survey or two while the build was running — I've done that before, just killed time during a long compile with a survey — but my head wasn't in it and I'd have gotten disqualified out of sheer inattention.
I also didn't sleep well Sunday night because I already knew Monday was going to be a dependency-trace day, and I handled that by staying up until 1 a.m. watching something on Netflix that I could not summarize now if you paid me. That was a choice I made freely and I regret it in the specific way I regret things I would definitely do again.
The side hustle stack runs on whatever's left after the day job takes what it needs. When the day job needs more — a bad build, a long sprint, a week of meetings that could have been emails — there's just less left. There is no workaround for that. I've looked.
What I Kept From the Build That Ran and the Standup I Barely Made
I went back and actually read the dependency chain after standup. Not because anyone asked me to — Marcus had accepted my forty-five-second update and moved on with his life — but because I wanted to know. I spent another hour on it. I left a longer comment in the repo than was strictly necessary. Some future version of me, or someone else on the team, is going to hit this same thing and find that comment, and maybe it'll save them a few hours. That felt worth doing even though it billed to no ticket.
I also set my standup notification to five minutes instead of one. That's the entire operational change that came out of this. Five minutes is enough time to close the terminal, find the link, and arrive sounding like a person who was already at his desk. One minute is enough time to panic.
The thing I didn't change: I still check the terminal compulsively when a build is running. I know it doesn't help. The build is going to finish when it finishes. I've taken standups from the driveway waiting on builds. I've eaten cold food waiting on builds. Watching the terminal is not a strategy, it's just what I do, and I've made my peace with it the way you make peace with checking your phone — not proud, not stopping.
The build finished. I made standup. I was thirty seconds late and slightly out of breath and nobody cared. The day job absorbed it the way the day job absorbs everything, which is completely and without ceremony.
The terminal is running something right now, actually. Different branch, different dependency, probably fine. I have a standup in forty minutes and I have already checked the output twice since I started writing this. It's still going. I'm not worried. I'm not.
Note: Everyday Hustle Jeff is the written side of a digital series. These accounts are composite and dramatized. Any figures are what they were on the day, for one person, and are not a projection, a track record, or advice.